Answer Posted / modipraveen
Hi,
Generally we will wait for 28th day test, If structure is
failure, then will intimate to Structural Consultant to
strengthen the structure.
Is This Answer Correct ? | 19 Yes | 1 No |
Post New Answer View All Answers
Where is the worlds longest elevator and how long is it?
what are the five benefits of using standard terminology in the measurement process?
How to calculate sand , cement quantity for 23mm thk brick work(10x10)
Explain the different types of building contracts?
How to marking the building
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
what is anchorage length,lap length and (dont remember the last one)
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
Describe the sections included in a typical bill of quantities
what motivates you to do a good job
What are the materials used in building a gravity dam?
What are the advantages of building a dam on the river nile?
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
Differentiate orthographic and isometric projections?