what will do when 7days concrete has failed and structure has
constructed?
Answer Posted / modipraveen
Hi,
Generally we will wait for 28th day test, If structure is
failure, then will intimate to Structural Consultant to
strengthen the structure.
| Is This Answer Correct ? | 19 Yes | 1 No |
Post New Answer View All Answers
Different sizes of Hollow blocks and its weight. Thanks.
Why should you show Client/Engineer activities clearly on the project plan?
load combinations how many types for staad design purpose?
Which is the direction of negative angle?
Define a polyline?
Can someone please be curing period of the following according to IS codes Column beam slab brick masonry raft found. and also tell how many hours/day
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
what course did you consider thinking before you enrolled in college?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
what is the productivity in aluminium shuttering per day
Define Workability ?
Why are steel plates inserted inside bearings in elastomeric bearings?
What are the materials used in building a gravity dam?
i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh