what will do when 7days concrete has failed and structure has
constructed?
Answer Posted / vimal prajapati
If 7 days result not getting,wait for 28 days.if 28 days
result not achived that perticular Quantity part breakdawn.
in any doubt with cube testing result we can also doing
core cutter test or rebound hammer test for at the 07 days
& 28 days sharp time period
| Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
As in practice, we are deducting every 2d for 90 degree bend but from where it comes means derivation or reference of IS Code.
howto calculate the quantities of material used in fly ash brick after finding the volume??
how to conversation of all construction material in to brass
it is possiblee to produce concrete with out cracks...
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
How much material is required for constructing a 2 Lane 2Km rigid pavement road
what will be density of a cement bag if its weight and volume are 50kg and 1.25 cft respectively???????
hii.plz send me hpcl placement papers for officers trainees for graduate engg plz my email id is ajm_knit@yahoo.com
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
how to calculate load for a bungalow and 1column carry how much load if the size of column ,9"*15" .....or total structure load......
150mm bricks size how many use 4.14 m3
what is w/c ratio in dry lean concrete for m10 mix design
What is the frequency of sampling for the materials of cement,Fine aggregate, Coarse aggregate .and refer which code
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?