what will do when 7days concrete has failed and structure has
constructed?
Answer Posted / vimal prajapati
If 7 days result not getting,wait for 28 days.if 28 days
result not achived that perticular Quantity part breakdawn.
in any doubt with cube testing result we can also doing
core cutter test or rebound hammer test for at the 07 days
& 28 days sharp time period
Is This Answer Correct ? | 4 Yes | 1 No |
Post New Answer View All Answers
cause of cylinder test failure
Gave a cantilever beam with 3 legs.Told to draw the bending moment diagrams, axial force diagrams and shear force diagrams.From BMD he asked to show how the reinforcement will be provided on the tension side.
density of crush sand & crush stone or grit powder
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Pls provide me with the calculation or codes related to de- shuttering of flat slabs
What are the uses of alloys in daily life and how are alloys made?
How do you calculate the power of a centrifugal pump?
How to calculate ventonite bag in pile ( pile depth 25 m dia 1m)
How does siphoning work?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/
does a b.tech civil engineer fresher supposed to know how to design rcc structure?
Why should pumping be not used in case of concreting work?
What is the bowing depth after stressing of PSC Girder of various spans and various dia of strands?
Is it possible to make a feature using an overdefined sketch?