what will do when 7days concrete has failed and structure has
constructed?
Answer Posted / suhana soni
i want to know.
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?
How can you achieve soil enforcement?
What are the different types of runners?
Explain soil analysis?
how to compute slab reinforcements on step by step procedures??
which method is used in semi-rigid connection design??
Spider cracks occur in beam bottom due to––
what is the ingredient value of 40mm and 20mm aggregates?
The portion of a brick cut across the width is called?
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
how many men days of loburs and masons are requirete for 1 cum,pcc (1:2:4),Pcc(1:3:6) and Pcc(1:4:8) thanking you
how we check the thickness and line of ceiling plaster.
How to determine dia of steel for use in column,slab etc. i mean how to calculate the diameter of steel which is to be used in structures.
i want texture painting pwd data