Answer / ramanathan
1.Ist I have to know about the PQAP
2.To meet the client requirements
2.What is my role there (i.e Structural & Finishing
item),then I have to do as per ITP.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / bala
1.I v'll get PQP and related document from my department to
know about my role and responsibility if iam fresh to QC
department.
| Is This Answer Correct ? | 3 Yes | 2 No |
Answer / jeyakumar
Refer Projects quality plan and do the job.If any
deviations found inform site engg/incharge and do rectify
and redo the same as per PQP.
| Is This Answer Correct ? | 1 Yes | 0 No |
how many cubic centimeter in one unit of sand?
what are the ffactors you considered choosing the course?
What is construction joint and expansion joint in CC pavements
what is penetration test?why it is done?
what are the Cement Coefficient for Block Work & plastering Work?
What is .Dwg?
what is the compressive strenth of m30 grade cocrete column at 7 days
What are the different grades of concrete ?
why the compressive strength of concrete is calculated only after 28 days.why not after 25, 26,27 days..
what is mixing ratio of M25?
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
in m45 what does m and 45 refers
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)