binding wire requirement in rcc structures
Answers were Sorted based on User's Feedback
Answer / santosh singh
about 9 to 13 kg of binding wire is required per ton of
steel
| Is This Answer Correct ? | 10 Yes | 6 No |
Answer / saalim
1 to 1.5 kg per quintal
ie 10 to 15 kgs per tonne depending upon dia of steel.
| Is This Answer Correct ? | 6 Yes | 2 No |
If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?
residential buildings,mixing of concrete,structural,construction material,site handling.
0 Answers Saudi Aramco Shell Refinery Company SASREF,
there is a residential building L = 20' B = 30' H = 20' stairs L = 3' H = 20' calculate the numbers of Threads and risers from stairs with formula
How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 Answers Aparna Constructions,
at the beam-column junction point tell me how much beam bars should pass through column ring ? 3 or 2 or 1 . answer with reason. if it is not happen then what will be he effect ?
what happened if the diameter of capillary tube is double then the capillary rise will be
what motivates you to do a good job
1 Answers Flextronics, HPCL, ISRO,
Lapping Work Explain Briefly
Define mirror?
what is Brick crushing strength(PSI)?
Machine mix is better than hand mixing to get––
what is the strength [final]of grade m 15 to m 45
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)