Answer / saquib hassan

ofcourse that would be 100 mm.

Is This Answer Correct ?    29 Yes 4 No

What is the minimum depth of a slab?..

Answer / ravindra kumar

125mm ( roof Slab )

Is This Answer Correct ?    3 Yes 0 No

What is the minimum depth of a slab?..

Answer / devineni srinivasa rao

minmum depth 4"

Is This Answer Correct ?    6 Yes 4 No

What is the minimum depth of a slab?..

Answer / mohd abid (civil engg)

Slab depth 100mm sure
1:6 inside wall plaster
1:5 out side plaster
You should know that also
1:3:5 concrete it is use tie beam and column also
25.4mm -1inche
MSL- mean sea level
DPC- damp proofing course

Is This Answer Correct ?    2 Yes 0 No

What is the minimum depth of a slab?..

Answer / fawadali930

125mm, minimum depth of slabe

Is This Answer Correct ?    0 Yes 0 No

What is the minimum depth of a slab?..

Answer / anil kumar

100 mm

Is This Answer Correct ?    0 Yes 0 No

What is the minimum depth of a slab?..

Answer / manoj choudhury

125mm

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

what is the initial setting time & maximum duration concrete get hardening for ordinary portland cement?

5 Answers  


as we take 30% of whole brick work masonry ,so how much % we take in block masonry?

1 Answers   azan,


how to convert cement, sand aggregate quantity from M3 to kg with full description?

0 Answers  


How much cements bag (or in KG) required for 1 Sq. M concrete, for M-30 grad concrete as per CPWD and where is thr proof on site

0 Answers  


What is cold joint, what will happen due to cold joint?

1 Answers  






how to conversation of all construction material in to brass

1 Answers   L&T, Lafarge,


Method for Calculating the WEIGHT OF ANGLE ?

3 Answers  


How many no of bars in a bundle of steel and kgs/bundle. 8 mm, 10mm, 12mm, 16mm, 20mm with both MS and TMT separate.

15 Answers   ABC,


For G+4 storied building having 76000 sft per each floor, can you prepare schedule in such a way that structure should be completed with in 41/2 months and finishing be completed with in 51/2 months?

1 Answers  


How to take cutting length of Stirrups when 10 leg has given Size is 1200x1200

1 Answers   Owen Builders,


can anybody suggest me or rather send me tutorial of staad pro..iam in real need..thanks..id is:-ankit99991@gmail.com.

1 Answers  


What is demising walls?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)