what is 3.14 indicates for cutting length of stirrups
why top layer of block work shoud be full size if any cut block adjustable than another layer?
while measuring slab for concrete Quantity it is practiced that steel quantity is not deducted in that particular qty.why?
What is the ratio of M40 Concrete?
Why we select pile foundations
What is standard sand? What is coarse & fine sand? What is foundation? What is the seze of hooks in various Reinforced section? What is the formula of providing clear cover? What is the basic diff. between working stress & Limit state design? What is &cbc and fck? what are the primary & secondary test of water purification?
How to calculate steel for a wall foundation form drwaing
What is the difference between one-way slab and two-way slab?
what is the maximum number of course that can be laid according to IS code and the max height.
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing.
5 Answers Dee Vee Projects, L&T,
a revised estimate is prepared when the original estimate has exceed by more than 1 percent 2 10 18.40
If 16 mm dia hysd bar of grade Fe500 is needed in a beam but it is not available in the construction site but the beam has to cast in an emergency. Which dia of bar is to be used for for that situation? (If greater than 16 dia bar is not available at site)