Explain what is Critical Path Method (C.P.M)?



Explain what is Critical Path Method (C.P.M)?..

Answer / Vivek Khodlan

Critical Path Method (CPM) is a project management technique used for scheduling and executing projects. It identifies the sequence of activities with the longest total duration, which is known as the critical path, and determines the minimum time required to complete the entire project.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

why do you desire to change from your current position?

1 Answers  


What is the best type of wood glue?

1 Answers  


How to do base isolation using ETABS software?

1 Answers  


what do you mean by ssd how it calculated

3 Answers  


what is the functional requirement of cement plaster in RCC members & masonry?? Is it Manditory to do plastering on all RCC members(beams, Columns, Slabs)? in what places plasterring could be kept as an optional one???

2 Answers   WTE,


is their any instrument which can detect steel after casting of slab,etc. for verification of steel in slab,etc.

1 Answers  


What will you do if a portion of load bearing wall collapses under your supervision?

1 Answers   Ramesh Associates,


Why the finite element method is lower bound solution?

2 Answers  


WHAT IS THE CAUSES OF RUTTING ON FLEXIBLE PAVEMENT?

1 Answers   Ace Info, Anil Group,


psc girder detail

1 Answers  


what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?

1 Answers  


what is defenation the rolling margine ? .. what is % for steel & what its effects if it is + or - ?

3 Answers   DLF,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)