why cracks develop at the upper corners of doors openings
Answer / yash rana
In Load bearing structure cracks are not developed while in frame structure cracks are developed so lintel is provided at the top of the door to avoid the cracks
| Is This Answer Correct ? | 0 Yes | 2 No |
CROSS SLOPE OF Macadam Construction
why & what is perchatage we are using fly ash in concrete?
List out the potential risk factors for workers on the construction site?
Define Who designed the city of Washington DC?
HOW MUCH WATER DO YOU NEED TO MIX IN TO COMPACT100M3 OF ROAD QUALITY BORROWPIT GRAVEL
what is mean by bPo in construction? pls tell me
Why are steel plates inserted inside bearings in elastomeric bearing?
What is the strength of Steel Fe 415 and Fe 500
1 Answers Aditya Constructions,
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
Contrete reaches its full strength in 28 days. Then, why are we removing shutter in 7/ 14 days?
Please give a brief description of centre of gravity
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)