why we do pcc.?

Answers were Sorted based on User's Feedback



why we do pcc.?..

Answer / kdg

Plain Cement Concrete (PCC) is nothing but a layer between
reinforcement and soil/mud to protect reinforcement as well
as RCC from direct contact of soil/mud beneath the
foundation.

Is This Answer Correct ?    16 Yes 1 No

why we do pcc.?..

Answer / guest

this is the leveling coarse.

Is This Answer Correct ?    14 Yes 3 No

why we do pcc.?..

Answer / yogesh yadav

plain cement
concret is a
base structre of
building,its save
to
renforcement
direct contact
to mud soil.

Is This Answer Correct ?    5 Yes 0 No

why we do pcc.?..

Answer / suresh s sonone

1.To make the surface uniform
2.To avoid the direct contact of R/F with ground.
3.To save the water absorbtion from concrete which is necessary for heat of hydration.

Is This Answer Correct ?    4 Yes 0 No

why we do pcc.?..

Answer / jainender

pcc doing far leveling he is protect mud and earth, dust ect

Is This Answer Correct ?    1 Yes 1 No

why we do pcc.?..

Answer / vignesh vicky

Not using for reinforcement

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

Significance/Uses/effect of Rolling Margin ?

1 Answers  


Where are laterally loaded piles are used in practice?

2 Answers   NBCC, Simplex,


could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!

0 Answers  


what is project?

0 Answers   PMC,


you are a civil engineering student so what you have done to improve your knowdge

8 Answers   Infosys,






how many jack required in1sqm area

2 Answers  


Why reinforcement done in shorter span in two way slabs

0 Answers   Osmani Constructions,


the steel diameters(mm) as 6,8,10,12,14,16,18,20,25,28,32...etc these are used in construction work but which mm size can be used for different structural element such as beams,columns,slabs,footing ?

1 Answers   L&T,


Can anyone give me the thumb rule for calculating the time required for construction based on quantity of concrete, Reinforcement, shuttering, etc

0 Answers  


WHAT HAPPEN WHEN USING OF LARGEST POSSIBLE MAXIMUM SIZE AGGREGATE RATHER THAN SMALLER AGGREGATE IN RCC ?

3 Answers  


what is the difference between replacement of cement by groundnut shell ash

0 Answers   Harit Dharaa,


How could I calculate quantities of fine aggrigates(sand) & coarse aggregates in pcc M15

1 Answers   Coromandel, RECPDCL,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)