Answer Posted / jainender
pcc doing far leveling he is protect mud and earth, dust ect
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
how to calculate quantity of cement,sand & aggregate for u.c.r / r.r masonry in cm 1:6
what is the max. and mim. height of vertical post in informatry sign board which is used in highway projects.
Exterior Joints,define
can i get civil engineering test papers.......?????
sir how can we find the cement and sand required for making 4" drop
what is education Cess.
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
what are the duties of Site Engineer in work site?
I have to design brick column and footing (note: without any reinforcement). Can somebody post me the design or suggest a book where i could possibly find the design? Plz help very urgent
Formula of area of crane hook
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
How much form and scaffolding per cubic meter volume of concrete class ''A'', ''B'', and ''C''
How will you Engage Labours on Site?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches