37.18kg/qu.cm.Compressive Strength and 10.20% Water Absorption weight,Efflorescence-nil
this result use in construction work
what is mean by compressive strength
what are the challenges of being a team leader and a supervisor?
Where will be the maximum bending moment in a TEE Beam?
per 1 cumt concrete how much manhours is required including shuttring,steel etc.,for slab & foundations
Instrument used for determining PH of water
1.(a.) how do you calculate the volume of mortar for 1 piece of block 450mm x 225mm x 225mm. (b.) calculate for 1sqm
How do you calculate the unit weight of concrete?
how to calculate rate analysis for column shuttering
9*9 1:4:8 ratio using how to calculate the material for 40mm aggregate ,cement &sand please tell me answer
on what basis the partial factor of safety are decided? form the load combinations
how to convert sand in Cft to Kgs
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
0 Answers Anish Constructions, STUP Consultants Pvt Ltd,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)