Answer / r.satyanarayana goud
MBOOK means measurement book which is used in construction filed to record thge executed quantity of works
| Is This Answer Correct ? | 67 Yes | 4 No |
Answer / k s k chakravarty
M.Book means Measurement Book. All the measurements of a
work are to be recorded in it. The M.Book normally contains
100 pages and issued by Executive Engineers certifying the
person to whom issued. It consists of the following columns.
Date of Description Nos L B D/H Qty. Rate Amount
recording
| Is This Answer Correct ? | 43 Yes | 0 No |
Answer / kakarapalli.suryaprakash
M-Book means Measurement Book. All the measurements of awork are to be recorded in it. The M.Book normally contains100 pages and issued by Executive Engineers certifying theperson to whom issued. It consists of the following columns.Date of Description Nos LB D/H Qty. Rate Amountrecording
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / akash dubey
mainly m book is used to note the instruction given by
executive enginneer at the site, but any engineer whether JE
aur AE , there instruction can also be noted down in
measurement book
| Is This Answer Correct ? | 10 Yes | 21 No |
how to distinguish TMT n Tor steel?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
is there any books available to know the methodology of construction process ( Site Process ) and also find the quantities of all materials used at site.
Lapping Work Explain Briefly
how much quantity of cement bags are required to fill the one m3 of empty container.?
how to test the quality of bars???
how to calculate no. of bricks for 1 cft? how to calculate cement and sand in cft?
How long does it take concrete to harden?
1 liter emulsion paint covered how much area?
17 Answers Asian Alliance Insurance, Aspirtek, DEWA, L&T,
how to carry out rate analysis for RCC work in column using M20 ?
1 Answers Mazna Building Contracting,
How are freeway bridges built?
How to replace dia of bar in beam like 25mm 3no.S at bottom But due to some reason on site 25mm bar is not available Then is it ok to provide 20mm 4no.S? Give description or Formula to calculate area of steel and replacement?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)