Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

why we do pcc.?

Answer Posted / suresh s sonone

1.To make the surface uniform
2.To avoid the direct contact of R/F with ground.
3.To save the water absorbtion from concrete which is necessary for heat of hydration.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Which is the indian standard code of line out. ? How much tolerance fot 1 mt lenght? Its challenge....

2360


What are your future hopes for this job?

2241


If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

2333


What is missing report and how to prepare

1473


what should be the PCC ratio to construct a plinth of (40x40x4)ft...??also its estimated cost??

3053


How to make a c++ program that converts any base to base 10?

2026


if in column reinforcement lower dia connect to higher dia then from wher we want to start higher dia steel

1362


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2098


I need model question papers for writing the Dubai municipality exam,for G+1

10537


What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.

2538


660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need

1577


how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1529


How to find permissible diagonal tensile stress in reinforced brick work

2469


how to clculate the %of concrete strenght achive after curing?load

2376


I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,

1942