CAn any one can tell me what is the operation of ceiling
fan and how it will start
Answers were Sorted based on User's Feedback
Answer / k.prakashchandra
Ceiling fan has single phase ,capacitor start and run
squirrel cage induction motor with rotor (armature) outside.
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / natha
it is basically a single phase induction motor.but they are not self starting so some starting mechanism is must.capacitor is one such solution.(agar ghar ke ceiling fan ko capacitor na ho ie direct spply to woh uss disha me ghumega jis disha me use ek halka push mila ho).motors ke baare me bohot jankari chahiye aur starting(laymans)terms me toh bl thareja vol2 padho.(ha aur ek aur baat do capacitor laga ke dekho maja ayega)
| Is This Answer Correct ? | 1 Yes | 0 No |
E.B sending end to receiving end 33kv ug cable laid 8Km,receiving end to ss1,ss2,ss3,ss4 all are Approx 800 Mtr,can go for 33KV to 430V or 33kv to 11kv in receiving end and 11kv to 430 near ss ,which one is good for technically and economically.
What is the difference between Floot charge and Trickle Charge.
Corona occurs between two transmission wires when they (a) are closely-spaced (b) are widely-spaced (c) have high potential difference (d) carry d.c. power
my bachelors was done with EEE now i got admit in NU with CS as course. how to answer this qns 1) why u choose cs? 2) why u changed from eee to cs
Why the transformers are rating in KVA.?
in industrial lighting in each circuit how many lamps can be given? and how much load can be put on each circuit? is there standard for this? please help me with the standard description?
Hello sir This is prakash from bangalore i have a doubt why we have to maintain DG power factor in the range 0.78 to 0.8 Perhaps i f it is increased means what will happen in DG
What is the electrical difference between Earthing Switch (ES) and Maintenance Earthing Switch (MES)?
how to connect the three phase capacitor in three phase star/delta connection motor?
Define pole pitch?
what is the resultant phase shift in a 3 phase power system including neutral if on or more phases gets grounded or short circuited. kindly explain in detail for the reasons...
detailed procedure how we calculate cost for pcc m10 and rcc m20 including centering and labour excluding steel/ iron
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)