Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how many quantity of water use in 1cu.m. concrete

Answers were Sorted based on User's Feedback



how many quantity of water use in 1cu.m. concrete..

Answer / raju msra

depending upon grade of concrete and water cement ratio. it will be about 180litres/cum

Is This Answer Correct ?    16 Yes 6 No

how many quantity of water use in 1cu.m. concrete..

Answer / sandesh

As per IS 10262 & IS 456

Is This Answer Correct ?    6 Yes 0 No

how many quantity of water use in 1cu.m. concrete..

Answer / shreekantabehera2@gmail.c

As per is code 456

186 Ltr water required 1 cum concrete

Is This Answer Correct ?    0 Yes 0 No

how many quantity of water use in 1cu.m. concrete..

Answer / prashanth

Its Depends upon Water cement ratio

Ex-if W/C ratio is .45 then
=.45x50
=22.5*100
=2250Lit/Cum

Is This Answer Correct ?    2 Yes 15 No

Post New Answer

More Civil Engineering Interview Questions

What is the difference between oneway slab and twoway slabs

2 Answers  


what is tension & compression of steel bending.

0 Answers   L&T,


what is the minimum spacing required for slab & beam reinforcement

5 Answers   Gammon,


HOW MANY CUBES REQUIRED FOR 7 AND 28 DAYS TEST FOR ALL MIX GRADES.

4 Answers   Ansals, HFCL, Jaypee, Pratibha Group,


shape of aggregates used in concrete should be rounded/cubical or elongated/flaky.

9 Answers  


How Much span required for 1 sqm of shuttering(Beam & Slab)

2 Answers  


If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).

3 Answers  


CAN WORK WELL UNDER DEAD LINES OR PRESSURE?

0 Answers  


i need the how much materials are needed for cubic feet of concrete?

1 Answers  


what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982

0 Answers  


how is shear resisted in a structure?

2 Answers  


What is the cement and sand consuption of 1:4 block work

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)