i need the how much materials are needed for cubic feet of
concrete?
Answer / guest
FOR PROPORTION 1:2:4 FOR 1CU-MT WORK OF CONCRETE CEMENT REQUIRED AS FOLLOWS
CEMENT ---6.5 BAGS
SAND ----0.434 CU-MT
KANKAR --0868 CU-MT
| Is This Answer Correct ? | 4 Yes | 0 No |
What are the methods of measurement? Describe it shortly
What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.
why demand factor less then 1 ?
What is limit state method and working stress method and ultimate method
Explain what is change order request?
what is the crushing strength of good building stone
What is the density of steel?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
i need gate exam civil engineering question papers with answers
what is the real de-shuttering time for rcc column,slaband wall
if mineral admixture add into concrete then what is the differences between full cement concrete & fly ash added concrete of their SP. Gr.?and for the changes of SP. Gr. what is the changes in concrete
Is Sugar a retardar or accelator or plasctizer?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)