what is the minimum spacing required for slab & beam
reinforcement

Answers were Sorted based on User's Feedback



what is the minimum spacing required for slab & beam reinforcement..

Answer / subhasbabu

FOR SLAB FOR MAIN BAR 3 TIMES THE DIAMETER AND 5 TIMES FOR
DISTRUBUTION BAR, BUT IN THE CASE OF BEAM MAXIMUM SIZE OF
AGGREGATE, AND MINIMUM BARS 2NOS FOR MAIN REINFORCEMENT

Is This Answer Correct ?    7 Yes 2 No

what is the minimum spacing required for slab & beam reinforcement..

Answer / piyush singh

slab : maximum spacing should not exceed

main steel = 3 * dia or 300
distribution = 5 * dia or 450

as per IS 456

Is This Answer Correct ?    4 Yes 0 No

what is the minimum spacing required for slab & beam reinforcement..

Answer / lear

for slab 150mm and for beam 200mm

Is This Answer Correct ?    9 Yes 6 No

what is the minimum spacing required for slab & beam reinforcement..

Answer / puspendu shyamal

minimum spacing required- (a)Diameter of the bar if the diameter is equal,(b)Diameter of the largest bar if diameter is unequal,(c)5mm more than the size of the aggregate,which ever is greater.

Is This Answer Correct ?    3 Yes 1 No

what is the minimum spacing required for slab & beam reinforcement..

Answer / prakash vaishnav

for slab 125mm and for beam 200mm

Is This Answer Correct ?    0 Yes 7 No

Post New Answer

More Civil Engineering Interview Questions

what is the constant weight of the 6mm,8mm,10mm,12mm,20mm,25mm etc.............dia bars in 1meter

7 Answers   MPSC, NMDC,


What is the Specific gravity of Fine and Coarse aggregate ?

1 Answers   Sohar Aluminium,


Instead of sand blasting is there any method to clean the rust of steel ???

2 Answers   L&T,


How to convert N/MM2 TO KG/CM2

2 Answers  


where should the lap of a beam should be

1 Answers  






can any give me bhel n other govt sec interview question

1 Answers  


how much aggregate need for 1:4:8 p.c.c in 1sqm area?

5 Answers  


we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12% from our customer but every month we have been paying the vat at 2% from our pocket on the total value of bill. our auditor told me the above method do not collect 2% from the customer side is it true?

1 Answers  


Explination of Expenwion Joints and Construction Joints in Panel casting of Causways?

1 Answers   NBCC,


what is the cut length for Fe 500?

3 Answers  


what is escalation?how it is done?

0 Answers   Vishal Nirmiti,


Grades of concrete

28 Answers   Mittal Steel, UNOPS,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)