If the design CBR of subgrade is 10% but the material available on site is 30%.will you compact less(like 90%) where you get desirable CBR(10%).
Answers were Sorted based on User's Feedback
Answer / hitesh kanpariya
No, sometimes material delivered on the site may be different or we can say its natural material so base on that we have to compact it.
Is This Answer Correct ? | 2 Yes | 0 No |
Answer / pranav pachori
NO FULL COMPACTION I.E 90%REQUIRED THOUGH WE CAN SUGGEST TO DESIGNER TO REDUCE THE THICKNESS OF SUB GRADE THOUGH GENERALLY SOIL NOT EXHIBIT SUCH A HIGH CBR LIKE 30% BECAUSE SUCH KIND OF HIGHER CBR BELONG TO GSB MATERIAL
Is This Answer Correct ? | 1 Yes | 1 No |
Answer / rk
For increase the cbr must be added bending material like sand and granular particals for making proper cbr.
Is This Answer Correct ? | 0 Yes | 0 No |
what is development length,where it is used and why it is used?
how the take measurement at column and beam junction
What is the unit weight if concrete?.
28 Answers Doshion, HCC, Jindal, KKR, RCL, Simplex, TCS,
what is the quantity of concrete required in 1 cubic meter volume without reinforcement
What is the difference between chamfer and fillet?
WHAT IS THE RATIO OF CEMENT:SAND:COARSE AGGREGADE IN M-20, M-25, M-30, M-35, M-40, M-45, M-50 CONCRETE?
What is the formulae of percentage of steel
what is penetration test?why it is done?
what is the m20 grade concrete ingredients?
M25calculate of formula which in kg cement of 1cum
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
How much quantity of cement,sand,stone used to build 1 cum of cc road??
0 Answers Pandey Construction Company,