what is the minimum compressive strength in 7 days for
m20,m25,m30

Answers were Sorted based on User's Feedback



what is the minimum compressive strength in 7 days for m20,m25,m30..

Answer / chandarsaras

66% of 20 or 25 or 30

Is This Answer Correct ?    35 Yes 5 No

what is the minimum compressive strength in 7 days for m20,m25,m30..

Answer / elango

66.7 percent

Is This Answer Correct ?    21 Yes 5 No

what is the minimum compressive strength in 7 days for m20,m25,m30..

Answer / sumit

This grade is design mix so Target strenth is Fck+4
for M20 (20+4=24) Means 24N/MM2

So Compressive strenth in 7 days will come is 16.24N/MM2

Any civil engineering related question Contact
skatiyar011@yahoo.in

Is This Answer Correct ?    9 Yes 4 No

what is the minimum compressive strength in 7 days for m20,m25,m30..

Answer / gulshan kamboj

it is 67%. but practically should varies between 70 to 75%.

Is This Answer Correct ?    6 Yes 4 No

what is the minimum compressive strength in 7 days for m20,m25,m30..

Answer / ilavarasan.g

70%

Is This Answer Correct ?    7 Yes 6 No

what is the minimum compressive strength in 7 days for m20,m25,m30..

Answer / aijaz hussain, modi builders

Mix 7 Days compressive strength

M20 175 kg/sq.cm.

M25 210 kg/sq.cm

M30 365 kg/sq.cm.

Is This Answer Correct ?    9 Yes 9 No

what is the minimum compressive strength in 7 days for m20,m25,m30..

Answer / vimal prajapati

in 7 dayas 70% min. compressive strength required

Is This Answer Correct ?    4 Yes 12 No

Post New Answer

More Civil Engineering Interview Questions

What is language of Engineering?

18 Answers   L&T,


How will drive weight formula for circular cylinder steel bar in kg/ m please step by step drive?

0 Answers  


What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?

0 Answers  


what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)

0 Answers  


1 cubicmeter liquid = how much litre

6 Answers  






which type of test carrying on the cement & why

1 Answers   LG Soft,


Where are laterally loaded piles are used in practice?

2 Answers   NBCC, Simplex,


for solid cement brick without fly ash,we use dust,6mm,12 mm jelly,water my question is what Proportion we mix dust,6mm,12 mm jelly,water ? for good strength brick.

1 Answers   bsmcpl, Ramky,


what is the voice of ratio ?

1 Answers   PMG, Power Grid,


What is need for setting limits?

0 Answers  


which things consider when the calculate the area of the flat?

2 Answers  


How many materials e.g bricks, cement, sand, stone required to build a house for 100 sqft

4 Answers   IRE,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)