what is the minimum compressive strength in 7 days for
m20,m25,m30
Answer Posted / chandarsaras
66% of 20 or 25 or 30
| Is This Answer Correct ? | 35 Yes | 5 No |
Post New Answer View All Answers
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
Define What is Civil Engineering?
What is difference between engineering stress and true stress?
what is stressing
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 600 microns?
explain fie benefits of using standard terminology in the measurement process
Explain the importance of moment of inertia?
Please Clear My doubt . We Can Design the size of the beam by manually by the Length of the beam...What is the technique adopted
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
Basic questions of civil engineering
I need to do a Compressive Strength Test for a specimen made of Rubber. Before doing the Test on the Machine, I need to have an idea of the Minimum and Maximum Compressive Strength or Yield Strength of the specimen. How can I calculate that?
How to take labor charges for construction of 1cum of concrete?
what is the anchorage length of reinforcement.
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
how much area can be platered by a mason for exterior