what is the minimum compressive strength in 7 days for
m20,m25,m30

Answer Posted / vimal prajapati

in 7 dayas 70% min. compressive strength required

Is This Answer Correct ?    4 Yes 12 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the productivity in aluminium shuttering per day

1573


Use of coping on terrace wall and in 4" wall is compulsory or not ?

1098


What is construction mitigation management?

1835


Is there the dry coefficient of cement is constant?

1830


Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem

2319






How to construct a water sump in a rocky soil?

1697


Why do you want to work here

1840


what is right & short method of measurement of slab&beam

1640


Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)

1544


What are the different types of runners?

682


How to activate isometric axes in cad?

726


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2140


what is hydrostatic paradox?

1709


At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.

1686


HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?

1749