what is the minimum compressive strength in 7 days for
m20,m25,m30
Answer Posted / sumit
This grade is design mix so Target strenth is Fck+4
for M20 (20+4=24) Means 24N/MM2
So Compressive strenth in 7 days will come is 16.24N/MM2
Any civil engineering related question Contact
skatiyar011@yahoo.in
| Is This Answer Correct ? | 9 Yes | 4 No |
Post New Answer View All Answers
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
Define What is made from large rocks, which protects the base of cliffs?
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
how gradation of aggregates effect on slump of fresh concrete?
How to cal. The weight of hollow pipe?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
Explain the benefits of using standard terminology in the measurement process?(Tendering and estimation)
hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having
How do you calculate the unit weight of concrete?
why we can use dust in concrete insted of fly ash
how calculate the bearing from two coordinates?
Define What is the origin of name Railway Sleepers?
What is the Null Point of chimney in Power Plant
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.