Please tell me the difference between nominal and clear
cover. Thanks.
Answers were Sorted based on User's Feedback
Answer / pvsnrao
Let us take, b = bredth of the beam
D = Overall depth of the beam.
Effective depth = overall depth-effective cover
effective cover = the distance from botttom of fibre of the
beam to the centre of reinforcement.
Clear cover = the distance from the bottom of fibre to
bottom level of the reinforcement
| Is This Answer Correct ? | 209 Yes | 23 No |
Answer / h. pradeep nair
nominal cover and clear cover are the same. both are the cover from the outer concrete to the outer face of the stirrups. latest revision of IS 456 says that NC is same as clear cover
| Is This Answer Correct ? | 89 Yes | 19 No |
Answer / mustafa mohd layeak
In beam of b*D dimension. considering bottom section of beam
effective cover is the distance between centre of main
bottom longitudinal rebar to the concrete extreme fibre
(bottom edge of beam).
clear cover is distance between concrete extreme fibre and
bottom edge of a stirrup
Similarly at the top section of beam
| Is This Answer Correct ? | 45 Yes | 8 No |
Answer / suchith kumar
effective cover=the distance from centre of iron rod to the bottom of fibre.
clear cover=the distance from bottom of fibre to bottom of iron rod.
| Is This Answer Correct ? | 20 Yes | 6 No |
Answer / joydeep dhar
Nominal cover means clear distance between face of concrete and face of main outer rebar, whereas effective cover means center of rebar to outside of concrete face, so Nominal cover < effective cover. viz. if 20 dia steel is used and nominal cover is 40mm then, effective cover will be (40+(20/2))= 50mm
| Is This Answer Correct ? | 12 Yes | 8 No |
Answer / ashis pal
please tell me cover use beam & column- main bar / stirrups .
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / binubal123
In nominal cover half diameter of the beam is added along with cover depth whereas in clear cover only depth of cover is included.
| Is This Answer Correct ? | 15 Yes | 59 No |
Answer / suraj verma
Clear cover is the distance between C.G of reinforcement bars and bottom most point of concrete.
Whereas ominal cover is the end to end distance of r/f bars and botom most point of concrete.
| Is This Answer Correct ? | 1 Yes | 45 No |
What is factor of safety in the plastic method design?
hai.... please any guide me were i can get interview questions& ans for Unigraphics
Why the name is "partial safety factor" why not "safety factor"?
0 Answers Engineers India Limited,
In footing (mat) if two different dia of rods are to be used which rod should be placed at top and bottom ( eg. 10mm & 16mm dia rods)
lap lenth
What is the development length given in pile?
why we used shahabad stone (ladi) in box type water proofing.what is the main roll of shahabad stone?
How to Know that veriation acceptable in CPWD Work Of 1:6 Cement Mortor Received Lab test report.
Exterior Joints,define
Which is code is used for measurmenr of reinforcement steel work.
what pressure the NP2 class RCC pipe can sustain?
Why did you choose this career?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)