Please tell me the difference between nominal and clear
cover. Thanks.
Answer Posted / hi123
clear cover is distance between concrete extreme fibre to the outer face of the main reinforcement which one only is the correct definition to clear cover and no other definitions are not fitted reg
| Is This Answer Correct ? | 3 Yes | 3 No |
Post New Answer View All Answers
rate analysis for cement pointing 1:4 , for 100 sq m
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
What is the coeffiencent Friction Angle between Steel and Ashphalt?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
Explain major difference between auto level and dumpy level?
How to get MEP technical,instaaltion & testing data for interview?
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
Define a polyline?
What is meant by autocad?
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
In block work seawalls what is the purpose of slip joints?
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
What are the different softwares used for cad?
How much cement and sand required for 9"brick wall per square metre
what is conrete grade ,how are depent on concrete grad and size of concrete?