effective cover=the distance from centre of iron rod to the bottom of fibre.
clear cover=the distance from bottom of fibre to bottom of iron rod.
| Is This Answer Correct ? | 20 Yes | 6 No |
Post New Answer View All Answers
What is the procedure and technnology behind jointing of prestessed block in Delhi metro rail project.
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is the largest concrete dam in the world?
The foundations are placed below ground level, to increase?
What is thumb rule in quality and quantity estimation of a Residential building??
what are the duties of Site Engineer in work site?
Explain what is 1/8 on the architect ruler denotes?
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
What is missing report and how to prepare
what is the formula to find the sttel (bar)length in beam having bent up at l/4 t 45 degree & 60 degree.
What is the compressive strength of fly ash bricks?
in the earthquqke the profile of water on dam is parabolic or not
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need