What is meant by access sequence? When it is used?
Answers were Sorted based on User's Feedback
Answer / sapomania
Access sequence is search strategy which
searches valid condition records from condition table for
condition types.
If we want to make the condition type
independent then we assign access sequence to it so that it
will fetch the value from condition tables .
But we dont assign access sequence to
dependent condition types because they take value from the
independent codtion type on which it is dependent .
For example PBOO is a independent condition
type so it will fetch value from the condition table
related to info record.Then other dependent condition
types related to surcharge , discount will take the value
from PBOO.
Is This Answer Correct ? | 68 Yes | 4 No |
Answer / rams
Access sequence is a search strategy,it searches for valid
condition records of a certain condition types.
Is This Answer Correct ? | 44 Yes | 3 No |
It is a search strategy defined by SAP to determine correct condition records available from multiple condition talbes for a specific condition type.. It is maintained in the condition type which accesses condition table then records.
Time dependent conditions must have an access sequence key such as RFQ, PIR , Time independent conditions like PO, no need of access key for them..
Is This Answer Correct ? | 0 Yes | 2 No |
Answer / pranali kadam
acess sequence is used to configure material master acess
sequence is assigned to sap reference material type
Is This Answer Correct ? | 7 Yes | 45 No |
How to deactivate a vendor so that it cannot be used for further transactions?
Explain the terms planned delivery and gr processing time?
Dear Sir I have one query regarding subcontracting Our firm provides blank paper to one vendor for printing work and takes it back after printing. The vendor is not sending the printed paper in a single slot, he send it in part by part. For example we send the blank paper 1000Kg for printing paper. Subcontracting vendor send it back after printing in the slot of 400 kg, 300kg and 250kg…..he tells us that remaining 50kg is wasted during printing and cutting process. We are not taking back the scarp material…we come to know finally about the qty wastage after the last qty receive and respective invoice made. So pls guide me to map this scenario in SAP. In our firm both the printed paper and blank paper lies in Raw material and raw material is non- valuated in our firm. I also tried it from my side. I created one Bom (cs01) Then I create the subcontracting Po putting the material and component provide. With cost centre and g/l account. (me21n) Then I provide the component to vendor (MB1B with mvt type – 541) Then I do the GRN for 400 and 300 and respective Invoice verification But at the time of final invoice and GRN we came to know that the qty is reduced. If we do GRN for 250kg, then the PO is still open for 50kg..And we are not taking back this 50Kg as it’s wasted during printing and cutting operations. Pls guide me map this scenario.
What is material length & What is the maximum linit to define it?
What are the commonly used movement types in sub-contracting process?
How to flag a material for deletion?
i woild like to know the configuration for the following scenario . The source of supply material "x"is only vendor, the same acts as the local vendor and the import vendor. how it is to be configured and what are its GR/IR effects
What is FRC and JIT in scheduling agreement?
How are components consumed in case of subcontracting?
What is consignment stock?
What is valuation grouping code related to obyc?
Which report will you refer to know the material consumption at plant level?