What are the steps in automatic account assignment config.
Answers were Sorted based on User's Feedback
Answer / pradip gawande
=>Account Determination Wizard
=>Account Assignment without Wizard.
OMWM Define Valuation Control
OMWD Group together Valuation Areas
OMSK Define Valuation Classes
=>Account Category Reference
=>Valuation Class
=>Material Type / Account Category
Reference.
OMWN Define Account grouping for movement
types
OMWB Configure Automatic Postings
OBYC Account Assignment
Is This Answer Correct ? | 27 Yes | 2 No |
Answer / sivakumar s
Material type is assigned to A/c Cat Ref.; A/c Cat. Ref is
assigned to Val. Class; Val. class assigned to G/L A/c.
Configuration :
OMWM : Activate Val. grouping Code
OMSK : Create A/c cat. ref and Val. Class; then A/c cat ref
assigned to material type.
OMWD : Val. area (plant) assigned to Val. grp. code (0001)
OBYC : Assign Val. modifier (0001), New Val. Class and G/L
A/c
Now create new material and assign new val. class in
accounting 1 data screen. Then create PO, GR.
Is This Answer Correct ? | 20 Yes | 5 No |
account determination
valuation grouping code in active
valuation areas grouping together assigned to valuation grouping code with respect to chart of accounts
create account cat ref and assigned to valuation class ,and assigned to material type
valuation class assigned to g/l account in automatic postings
Is This Answer Correct ? | 0 Yes | 0 No |
what is the difference between credit memo and subsequent credit memo
i want to know ,what is the interaction between SAP MM and SAP ABAP consultant and How does they interact?please give some real time technical details as soon as possible
"only 0.000 pieces are available" what does it mean during goods issue??
What are release procedures with and without classification?
How you can link a document to a vendor master record?
what is the item category and account assignment category in sap. what is the perfect answer for it.
WHICH IS BEST INSTITUTE IN BANGALORE FOR PROJECTED ORIENTED TRAINING ON SAP MATERIALS MANAGEMENT?
Where is material master data saved?
I have created schedule line for one po that delivery date for some qty is for eg.20th of dec
which is the best institute for sap oil & gas in india ? except BPCL..
How are batch numbers assigned?
How is the pricing of consignment stocks done?