Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to calculate cement required for m20,m5 grade

Answers were Sorted based on User's Feedback



How to calculate cement required for m20,m5 grade..

Answer / amey pathak

for M20 grade ratio is (1:1.5:3)
we consider for 10m3
add 50% for shrinkage & wastage
then it is 10+5=15m3
cement= 15/1+1.5+3 *1
= 2.72m3
for no. of cement bags = 2.72/0.0347
= 78.38 no.
= 79bags for(10m3)
so that for 1 m3 it is around 8 bags..........

Is This Answer Correct ?    61 Yes 16 No

How to calculate cement required for m20,m5 grade..

Answer / kesav

For M20 concrete, The ratio of the mix is 1:1.5:3 (Nominal mix)
The total parts is 1+1.5+3 =5.5
Part of the cement is = 1/5.5
The total volume raw material for 1m3 of mixed concrete practically =1.57m3
Unit weight of cement =1440kg
Weight of cement per bag = 50kg

Now the calculation is =1/5.5X1.57X1440
= 411kg
In terms bags per m3 of conctrete is 411/50 = 8.22bags

Is This Answer Correct ?    49 Yes 10 No

How to calculate cement required for m20,m5 grade..

Answer / nimmakayala

for M5 it is 2.5 to 2.6bags/Cum
the proportion is based on volume ie (1:5:10)

for M20 cement required is 8.01 bags/Cum approximate (as it
Design Mix it differ)

Is This Answer Correct ?    46 Yes 20 No

How to calculate cement required for m20,m5 grade..

Answer / ramesh kumar

ANY RCC 1 M3 CONCRETE REQUIRED 20 MM METAL- 0.9M3

M20 MIX- 1: 1.5 : 3

3 PART OF METAL - 0.9 M3

1.5 PART OF SAND - 0.45 M3

1 PART OF CEMENT - 0.45 / 1.5

- 0.3 M3
1 M3 CEMENT - 1440 KG
0.3 M3 CEMENT - 1440*0.3

-432 KG = 8.64 BAGS

Is This Answer Correct ?    7 Yes 3 No

How to calculate cement required for m20,m5 grade..

Answer / mujtaba hussain

For M20 concrete, The ratio of the mix is 1:1.5:3 (Nominal mix)
The total parts is 1+1.5+3 =5.5
Part of the cement is = 1/5.5
The total volume raw material for 1m3 of mixed concrete practically =1.57m3
Unit weight of cement =1450kg
Weight of cement per bag = 50kg

Now the calculation is =1/5.5X1.57X1450
= 413.859kg
In terms bags per m3 of conctrete is 414/50 = 8.28bags

Is This Answer Correct ?    3 Yes 1 No

How to calculate cement required for m20,m5 grade..

Answer / mujtaba hussain

For M20 concrete, The ratio of the mix is 1:1.5:3 (Nominal mix)
The total parts is 1+1.5+3 =5.5
Part of the cement is = 1/5.5
The total volume raw material for 1m3 of mixed concrete practically =1.52m3
Unit weight of cement =1440kg
Weight of cement per bag = 50kg

Now the calculation is =1/5.5X1.52X1440
= 397.98kg
In terms bags per m3 of conctrete is 397.98/50 = 7.96bags

Is This Answer Correct ?    1 Yes 2 No

How to calculate cement required for m20,m5 grade..

Answer / surya v kuchibhotla

While designing the mix, we shall take various paramenters
such as; workability, exposure, quality control etc., into
cognizance. If we consider the workability as 0.8, exposure
is moderate, QC as good, FA is in Zone-III, then quantum of
Cement required for 1cum of M20 concrete is; 53Gr OPC-465
kg, CA-1184.82 kg,FA-495.77 kg and water 186 lt.

Is This Answer Correct ?    0 Yes 14 No

How to calculate cement required for m20,m5 grade..

Answer / srilingamoorthy

for M20 grade of concrete
Ratio 1:1.5:3
(i.e) cement : coarse aggregate : Fine Aggregate.
( jally ) ( sand )
1cubic metre cement = 1440KG
In the concrete 0.45% of the sand ratio is utilised for
cement.so for M20
= 0.45/3 X 1440
=0.15 X 1440
= 216Kg/cubicmetre
= 4.32Bags of cement/cubicmetre of concrete

Is This Answer Correct ?    4 Yes 31 No

Post New Answer

More Civil Engineering Interview Questions

How do you calculate the mix ratio of concrete i.e. what is the cement:sand:agrugate ratio in 20Mpa, 21Mpa, 22Mpa etc...

2 Answers  


I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?

0 Answers  


Our IDCT industrial cooling tower height is 15 mtres so need to RCC structure stability test as par any IS Standard or Indian act.

1 Answers   Sepco,


What is thumb rule in quantity and cost estimation of a residential building in civil engineering??

0 Answers   Ascent Constructions,


Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used

0 Answers  


How to calculate the thickness of the rcc slab?ll u pls tell the formula?

2 Answers  


What is the quantity of cement in mix m20 concrete?

0 Answers  


Laboratory experiments conducted in Mumbai on a particular mix showed a strength of 33 MP a for a fully matured concrete. Find whether formworm can be removed for an identical concrete placed at Jammu at the age of 15 days when the average temperature is 60C. The stripping stress in concrete

2 Answers   CCIL,


What is Architect-Prepared Contract?

0 Answers  


how to calculate the quantity of plaster.

3 Answers   DB Realty,


What is Purpose Of Stirrups give  In Beam ?  

1 Answers   KP,


CAN V USE CRUSH SAND FOR CLAY BRICK MASONARY

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)