how to calculate cost of raw materials of a building for
1000 sqft & also consolidated cost of labour in a 1000 sqft
building
No Answer is Posted For this Question
Be the First to Post Answer
What expenses counted in contingencies and how much it is in related to built-up area of the building.
y we need to take 28 days strength as compressive strength ? y cant we take 30 th day
why moment is create in fixed beam. And why moment is not create in simply support beam
what a pigment?
What is portland cement
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
what is meant by shear center?????
logical reasoning
What is the difference in Cement content for M-20 Concrete if y ou use OPC & PPC? What is the difference in the Curing Period?
strength of bitumen concrete with 80-100 & 60-70 grade bitumen
which type of test carrying on the cement & why
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)