Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to calculate cement required for m20,m5 grade

Answer Posted / kesav

For M20 concrete, The ratio of the mix is 1:1.5:3 (Nominal mix)
The total parts is 1+1.5+3 =5.5
Part of the cement is = 1/5.5
The total volume raw material for 1m3 of mixed concrete practically =1.57m3
Unit weight of cement =1440kg
Weight of cement per bag = 50kg

Now the calculation is =1/5.5X1.57X1440
= 411kg
In terms bags per m3 of conctrete is 411/50 = 8.22bags

Is This Answer Correct ?    49 Yes 10 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How we calculate the service time of buildings

1828


How can explode a block?

1085


Will water damage concrete?

1201


what is the breaking strength of wall tiles

2431


what is conrete grade ,how are depent on concrete grad and size of concrete?

2475


How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9

2027


LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.

2004


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

1612


what is the difference between tsp & tower

2317


Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required

1981


What is the difference between built area and super built up area?

1168


What is limit state method and working stress method and ultimate method

1584


The portion of a brick cut across the width is called?

1486


How many bricks are there in 100cft?

1220


Define line type?

1051