How to calculate cement required for m20,m5 grade
Answer Posted / surya v kuchibhotla
While designing the mix, we shall take various paramenters
such as; workability, exposure, quality control etc., into
cognizance. If we consider the workability as 0.8, exposure
is moderate, QC as good, FA is in Zone-III, then quantum of
Cement required for 1cum of M20 concrete is; 53Gr OPC-465
kg, CA-1184.82 kg,FA-495.77 kg and water 186 lt.
Is This Answer Correct ? | 0 Yes | 14 No |
Post New Answer View All Answers
Explain different types of rcc pipes.
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
sir please send me campus placement questions in civil engineering
The largest size of paper used in plotter to print the drawing made by Autocad .
how we calculate the grade of the Bituminous materials.?????
contractor receive 100 MT steel.after compliting the work the contractor refund 90 MT steel.How reconsilation of steel done?
In a concrete grade C35A, C & A stands for what and equalent cube strength?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
please briefly explain calculating or estimating steel quantity for a RCC column?
how much cost of single coat 20mm thick plastering per sqre meter
60-70 grade of Bitumen is VG-30 ?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
what is the list of building construction equipment & teir output?
what is difference between GTS bench mark and temporary bench mark
pls tell me , what is the water content