why we use RYB phase sequence? and somewhere we use UVW ?
why?
Answers were Sorted based on User's Feedback
Answer / roysayan01
In 3 phase ac systems, as the name depicts, there has to be
3 phases and these 3 phases are named as RYB according to
some international standards. Practically when we see the
three phases we will not be able to distinguish between the
3 phases & so they r coloured Red, Yellow & Blue to help us
identify the required phase.
A RYB transmission line shouldnot be connected to any other
phase sequence like YRB or BRY etc, it has to be connected
with another RYB only otherwise a large circulating current
will flow because of different impedances of different phases.
Is This Answer Correct ? | 43 Yes | 33 No |
RYB Sequence for Transmisson & distribution system &
UVW Swquence for Motors & Generators Connections.
Is This Answer Correct ? | 10 Yes | 6 No |
Answer / ramesh.e
In 3 phase ac systems, as the name depicts, there has to be
3 phases and these 3 phases are named as RYB according to
some international standards. Practically when we see the
three phases we will not be able to distinguish between the
3 phases & so they r coloured Red, Yellow & Blue to help us
identify the required phase.
A RYB transmission line shouldnot be connected to any other
phase sequence like YRB or BRY etc, it has to be connected
with another RYB only otherwise a large circulating current
will flow because of different impedances of different
phases.
Is This Answer Correct ? | 14 Yes | 14 No |
Answer / shanmugam
3 phase voltagein order into maximum postive or negativeusing value order is phase sequence
u v w winding in uppar language
Is This Answer Correct ? | 0 Yes | 1 No |
RYB has been used because this is the normal colours of the
3 phases (Red Yellow Blue). Now the international standard
is RWB (Red White Blue) because the earth is Green with an
Yellow stripe. This change is because some colour blind
people will see red as green and green as red when the
colours are together.
UVW is the terminal naming standard.
Is This Answer Correct ? | 9 Yes | 11 No |
Answer / hariprasanna
RYB SEQUENCE IS TO DISTNGUISH THE THREE PHASE WIRES...NOW WE R USING U,V,W INSTEAD OF R,Y,W ..THIS IS OUR NEW CONVENTION...
Is This Answer Correct ? | 12 Yes | 30 No |
how to calculate the size of cable for 100 kva load,?can somebody tell me with a formula
Application Comparison between 22KV (UE)and 33KV (E) system. Are we allowed to use 33KV (E) cable in lieu of 22KV (UE) cable. What are the technical disadvantages.
how to calculate diesel consumption of a D.G.Set?
why corona ring is used in out door switchyard lightning arrestor
Why electrons flow only one direction in semiconductors. why can not flow both directions
i want to put single phase load on scott connected transformer,eventhough how to balance the transformer.
what is the current setting for different relay protection for transformer .
What are marginally stable systems?
what is meaning of AMF, WHY IS USING IN GENSET
what is reactive power is it good or bad for a system
what is the speed of current?
Wheather there exist any dc transformer