Dear sir,
iam completed iti ncvt electrician 2000-2002 &
diploma electrical eng completed 2008-2010 distance
education in rvd university, still i got B licences only but
my working company want C licences, how to i get c licencese
pls reply me iam in critical situation
thank you
karthick 9841637803


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

what is the fullform of mccb

10 Answers   Thermax,


what is the min and max ohmic resistance for the earthing rod installed for lighting poles for street light network

1 Answers  


Slow acting fuses are most often used for which application a) Lighting circuit b) heating circuit c) Motor D) Radar circuit

1 Answers  


A three phase transformer 460v primary 220v secondary (three phase four wire system.) Why did we get 460 volts across the neutral on the secondary side?

3 Answers  


Why we are going for converter transformers for DC drives application instead of distribution transformer?

0 Answers  






WHICH SUPPLY IS BETTER FOR 4 MW LOAD. 1)TO TAKE NEARER AVAILABLE 11 KV SUPPLY OR 2)TO TAKE 33 KV SUPPLY WHICH IS AVAILABLE AT 10 KM DISTANCE BY INVESTING NEARLY 50-60 LACKHS

1 Answers  


if i conncet ct with ct ratio of 600/5 to an energy meter having ct ratio of 100/5, the reading show by the meter will correct, if wrong is there any method to calculate correct value with shown value, if yes please state it.....

2 Answers  


-What is leakage current . how much leakage current is allowed.

3 Answers  


When testing an earthing connection, we use a 60 or 100 candle bulb with a phase connected direct from supply and the other wire to the new earthing provided.If the bulb glows then the earth is ok.Else earth connection is not Ok. So, why dont we can use all the home appliances taking a single wire from the phase and the return connection to Earth instead of return connection to neutral?

2 Answers  


calculate multiplication factor of a trivector meter with line ct ratio 200/5A, line PT ratio 11000/110V and meter CT ratio 200/1A and meter pt Ratio 11000/110V.

4 Answers  


How you take care of a motor from over loading and what are the different overloading ratings of different motors?

4 Answers  


why two over current realy used in vcb.

2 Answers   BSES, Wipro,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)