why we use RYB phase sequence? and somewhere we use UVW ?
why?
Answer Posted / kj
RYB has been used because this is the normal colours of the
3 phases (Red Yellow Blue). Now the international standard
is RWB (Red White Blue) because the earth is Green with an
Yellow stripe. This change is because some colour blind
people will see red as green and green as red when the
colours are together.
UVW is the terminal naming standard.
| Is This Answer Correct ? | 9 Yes | 11 No |
Post New Answer View All Answers
What is Delta Connection? What is meant by Forward Delta & Reverse Delta & How Will be the Connection in Power Transformers?
wat is meant by PX class in ct?
HOW CAN YOU CALCULATE PRACTICAL EFFICIENCY OF A ASYNCHRONOUS INDUCTIONMOTOR OF 7.5KW,& MOTOR IS RUNNING WITH AVOLTAGE OF 410 VOLTS,& TAKING CURENT OF 13 AMPS
How to calculate capacitor bank size at a load 800kVA.
what is mean by Digital Logic Meter (DLM)
Write the force balance equation of ideal dashpot element.
hi frnz,can somebody give me any project work? i am a 2nd year student & interested in practical works...plz give me some projects
Vaccum circuit breaker
What does quality factor depend on in resonance?
What are the disadvantages of autotransformer?
How wire size can define in electrical wiring? What is the ratio?
how we select ac fuse rating of an power inverter???
How relay coordination has to be done? what are the inputs are required for this? Please explain this with calculation method?
Saving in copper achieved by converting a 2 winding transformer in to an auto transformer is determined by A voltage transformation ratio B load on secondary C quality of core material D size of transformer core
234 MVA Generator 3 phase Short circuit current Values required? Gen set Rating-234 MVA, Gen Voltage-18kv, PF;0.8, Xdv:23.5 %, Transformer Rating-18/380KV, 680MVA,Yndd1 two winding, Step up TR, ZT:35.50 %,X/R 4.33 Gen CB Position, CB open ,Disconnected open, Generator Running Voltage 18 Kv, Bi mistakes generator side earth switch Closed during that time short circuit current level in 3 Phase required, and how to test on site 234MVA Generator Short circuit current,