Generally for high rise building shuttering is taken as 3.5
times of floor area
but in case where there are Post tension slab the ratio is
taken as 3
| Is This Answer Correct ? | 6 Yes | 1 No |
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
standared weighs for differnt grade of concrete
How to calculate material requirement for 230mm thick, 1 sq.m brick masonry?
what are the minimum compressive strength required for the concrete cube for different grades & different days .Please give me an answer.
how to the steel dia without using d2/162
3,6,13,26,33,66,____
what are the values of compressieve strenght?
What is Curtailing of R/F
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
Is there a way to know the aprox shuttering qty if vol of concrete is known? any thumb rule?
what does the track parameter mean in staad.pro?
what is the specific gravity of cement .define it and value?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)