Is there a way to know the aprox shuttering qty if vol of
concrete is known? any thumb rule?
Answer Posted / narendra
in Bridge case taking 5 Sqm per Cum
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
how to calculate freeboard in under ground water tank and technical details
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
How did the romans get water up hills using aqua ducts?
how to control PQI (Project Quality Index)
In which code the the maximum height of concrete casting has been explained
what is civil engineer greatest strength and weakness?
What is the Unit weight of coarse sand (F.M- 2.20) ?????
what is the minimum compressive strength of clay brick
why top layer of block work shoud be full size if any cut block adjustable than another layer?
what is the mode of method of face bar measurement
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
Define line type?
how much tempareture are required to make liquid state of pid leed
can i get civil engineering test papers.......?????
length where bent up is made in slab of bridge from one end