Is there a way to know the aprox shuttering qty if vol of
concrete is known? any thumb rule?
Answer Posted / dushyant bansal
Generally for high rise building shuttering is taken as 3.5
times of floor area
but in case where there are Post tension slab the ratio is
taken as 3
| Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
How you read 5x3x1 #4 @ 20" 0/C in steel structure?
what is meant by shear center?????
What is meant by scaffolding coefficient?
What is construction mitigation management?
Stringer How many cm goes to landind
Pls explain me about tension and compression in a flat slab
how to identify the failure of building by expansive soils
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
In case if concrete box girder bridges how is the number of cells determined?
Calculation of Pier Cap with tapper area?
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
what is the method used for marking of cantilevers in hirise buildings by using theodolite
What is standard Sand? What is Regime condition? What do you mean by the core trench in Earthen Dasm? What is soundness test for cement? When negetive shear force takes place in a R.C.C member?
rate analysis for cement pointing 1:4 , for 100 sq m
Which prize is the alternative to the NOVEL Prize?