Is there a way to know the aprox shuttering qty if vol of
concrete is known? any thumb rule?
Answer Posted / dushyant bansal
Generally for high rise building shuttering is taken as 3.5
times of floor area
but in case where there are Post tension slab the ratio is
taken as 3
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
how much of the strength comes from post-production curing
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
Explain what is 1/8 on the architect ruler denotes?
What are the uses of alloys in daily life and how are alloys made?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
How to calculate laplength for 3 floors
Define angular dimension?
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
Will going from a 3-tap to 6-tap increase water pressure?
What is the outturn of Ceiling plastering
Aptitude, reasoning, quants, verbal and technical question
how much used soil in 1 brick of standard size?
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
how much required strength of cement concrete bricks(size 230x115x75mm)