Describe a time when you anticipated potential problems and developed Preventive measures
No Answer is Posted For this Question
Be the First to Post Answer
In built up area basis what is ratio of concrete
How to calculate the no of bags required for 12mm thick 1:6 plastering?
what is the density of fine sand grade-2
sir iam dng my engg final yr (civil) iam intrested to write group_1 .if we write this exam what kind of jobs we get and what should be the minimum score for us to get qualified and iam having reservation too.
HOW MUCH WATER DO YOU NEED TO MIX IN TO COMPACT100M3 OF ROAD QUALITY BORROWPIT GRAVEL
How to calculate the amount of cement & sand required for plastering work with ratio 1:4 please give me an answer with detailed step.
6 Answers DSR Management, Simplex,
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
What is difference between limit state and working stress method? How it is applies in building structure.
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
HOW TO DETERMINE FOUNDATION DEPTH OF A MULTYSTORIED BUILDING. IS THERE ANY OTHER FORMULA EXCEPT RANKINE'S MINIMUM DEPTH FORMULA.
What are the different types of civil engineering?
how statics is different from dynamics
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)