A floor has to be removed partially with block work tying
floors together, can block work continue on floor that has
to removed excluding demolishing works tying floor from
underside of slab and top of slab demolishing floor upon
completion?
WHAT IS MEANT BY ZERO VALUE IN QUANTITY SURVEYING
What are Standard weights for concete of gradeM10,M15,M20,M25,M30 Etc.
Explain different types of rcc pipes.
Define mirror?
Which IS Code/American Code applied for coupler test of steel
what is the ratio of cement water and sand in RCC?
What is the amount of brick in cum we get in a BIG LORRY approx ??
Why Is Propping Required For Long Structures Once The Form Work Is Removed?
Which apparatus done steel (bar) tension test
For what purpose bedding is used under storm water drains, explain?
What is kn measurement?
what r the precaution for high in atp tempareture,low in atp tempareture
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)