Answer Posted / ramir v. agustin
3+10=13
6+20=26
13+20=33
26+40=66
33+40=73
66+80=146
3,6,13,26,33,66,73,146
| Is This Answer Correct ? | 4 Yes | 12 No |
Post New Answer View All Answers
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
What is factor not to be taken in consideration in mix design?
What are the advantages and disadvantages of lead products in construction?
the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
what is concrete canvas?
what is the minimum cement content for M20 & M25 as per is code -456(2000).
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
Hi.. Can i get hel in finding HPCL previous year question paper? plz help me in finding thiss..
What is an ice dam sock?
what is the relation between pitch of steel and depth of slab?
please send me bhel questions on rupesh.017@rediffmail.com
What is the purpose of the gap in the road on this bridge?