what is the unit of heat of hydration?

Answers were Sorted based on User's Feedback



what is the unit of heat of hydration?..

Answer / vinay arora

cal/gram.

Is This Answer Correct ?    43 Yes 1 No

what is the unit of heat of hydration?..

Answer / mohan

Calories/gram

Is This Answer Correct ?    25 Yes 2 No

what is the unit of heat of hydration?..

Answer / snigda

calories/gram (cal/g)
Heat evolved by chemical reactions with water, as during the
setting and hardening of portland cement.

Is This Answer Correct ?    15 Yes 1 No

what is the unit of heat of hydration?..

Answer / singhkk

cal/gm

Is This Answer Correct ?    2 Yes 0 No

what is the unit of heat of hydration?..

Answer / bibin sharma

kilojoules/mole

Is This Answer Correct ?    1 Yes 1 No

what is the unit of heat of hydration?..

Answer / rajesh kumar jha

unit of heat of hydration is calorie

Is This Answer Correct ?    0 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

i want measure water capacity in 25'diameter and 7'height of water in circular storage tank in liters how?

7 Answers  


what is the definition of stress& strain.

1 Answers   PBL,


why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure

0 Answers   C&W,


what compressive strength of bricks?

4 Answers  


how many cement used in single story residential building per sqft

0 Answers   Matrix PMC Consortium,






how to calculate the steel for rcc slab 1100 Square feet

1 Answers   Jaihind Projects,


How do we get this formula Ast=(0.5Fck/Fy) into(1-(in sqrt(1-((4.6Mu)/Fck.bd^2))into bd Fck=grade of cement i.e M25, M20 Fy=grade of steel i.e.Fe415,Fe250 Mu=moment b=width d=depth 

1 Answers  


How do we calculate absolute pressure?

0 Answers  


curing of concrete why 7day's,14day's 21day's 28days

5 Answers   Gammon,


if a 1 storey building is constructed without columns&beams and having the thickness of walls 12" in which cement&sand mortar is used what is the lifespan of building

0 Answers   Ryna Facilities Services,


How to find the requirement of cement and sand for the 1cum of rr masonry work

1 Answers   S Tech,


how many plastr work in one bag cement

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)