3,6,13,26,33,66,____

Answer Posted / cbsrinivas

i think the next is 71
here we have 3,6,13,26,33,66 ok
1st 3+3=6
2nd is 6+7=13
13+13=26(following same order)
26+7=33
33+33=66
so obvioisly the nxt will be 66+7=71

Is This Answer Correct ?    4 Yes 34 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.

1544


What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)

1191


What is proportion of PCC Grade G?

1601


Forces in a Shear Wall are in plane or out of plane ?

662


How you can turn off the display for dimension in CAD?

636






may i know the detailed description of cutting length

1637


quantity of material needed for rubble stone masonry for 1:4 and 1:6

1226


how much used soil in 1 brick of standard size?

1575


What are the reasons for geotechnical site investigations in uganda?

649


what is the use of water bar in water tank and is this an extra item in estimate?

2122


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?

1863


if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????

1812


what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)

1520


what is the criteria for the finalisation of pavement thickness in road project?

1591


how we can find sieve #4 is 4.75mm?

1875