Answer Posted / cbsrinivas
i think the next is 71
here we have 3,6,13,26,33,66 ok
1st 3+3=6
2nd is 6+7=13
13+13=26(following same order)
26+7=33
33+33=66
so obvioisly the nxt will be 66+7=71
Is This Answer Correct ? | 4 Yes | 34 No |
Post New Answer View All Answers
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
What is proportion of PCC Grade G?
Forces in a Shear Wall are in plane or out of plane ?
How you can turn off the display for dimension in CAD?
may i know the detailed description of cutting length
quantity of material needed for rubble stone masonry for 1:4 and 1:6
how much used soil in 1 brick of standard size?
What are the reasons for geotechnical site investigations in uganda?
what is the use of water bar in water tank and is this an extra item in estimate?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting?
if we know load bearing capacity of the soil and building load falling in each footing, then how to choose the type of foundation??? and if it is shallow foundation then which type of shallow foundation should be choosen i.e either strip or isolated or raft or combined or cantilever footing???????
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
what is the criteria for the finalisation of pavement thickness in road project?
how we can find sieve #4 is 4.75mm?