different type of formwork?
Answers were Sorted based on User's Feedback
Answer / onkar bhardwaj
Normally three types:-
F1- third class
F2- 2nd class
F3- 1st class
| Is This Answer Correct ? | 0 Yes | 0 No |
How we can calculate the quantity of sand, & cement, & also aggregate for a slab. Length 25'/3.28 = 7.62 Mtr width 20'/3.28 = 6.09 Mtr depth 6" /3.28 = 0.152 Mtr
sir i have 2700sq.ft area.i wish to make a coomercial space including this area.sir what could be the estimated cost of 3 story bulding in varanasi.
tell me how to calculate by weight and by volume the quantity of cement sand mortar of 1:2
What is the m25
6 Answers Itd Cementation India, L&T,
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
how many bricks are required for masonary trench having length of 31 mtr, depth of 0.6 mtr and breadth of 0.45 mtr on single brick work as well as double ( 9" ) brick work
in railway engineering, what are the types of guages? what is its size,length & thickness?
What year was the keystone power plant in Indiana County constructed?
20 mpa what is the quantity of cement sand and aggregate in one cubic meter of pcc non rainforcement concreate kindly answer including formaula thanks
the distrubution system in water supplies is designed on the basis of avg daily demand peak hourly demand coincident of draft greater of B & C
How to calculate the capacity of Water tank?
for 1cum how much bag of cement is used for M20 grade
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)