Post New Answer View All Answers
may i know the detailed description of cutting length
is there any influence of water(used for mixing of concrete) on a weight of harndend concrete.
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
pls give me some basic informations in construction of a structure?
All aptitude question of Bechtel
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
if size is 235cmsx15cmx100cms so how many cement bags and how many sand bags are used for concrete mix
how much need sand and cement for 1 cft roof construction?
100mm block work 64 bags of cement used 150mm block work 286 bags of cement used 200mm block work 20 bags of cement used patly work (M15) 293 bags of cement used mortar ratio is 1:5 how to calculate volume of sand in cum & no. of bags
What is gravity flow?
How can I make justification between using concrete grade c35 compare c37?
how to calculate number of bitumen for road asphalt
cement and sand required for one block of size 0.23*0.15*0.46
use ofr concrete as per grade ?