Answer Posted / neelam
IS Refers to INDIAN STANDARD
Is This Answer Correct ? | 12 Yes | 0 No |
Post New Answer View All Answers
What is the density of 1:1.5 (Cement:sand) ratio in plaster? And Conversion in 12.5 mm thickness per square meter? Howmany Kg of Cement square meter in ratio of 1:1.5?
What is unit weight of normal concrete?
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
what might be the problem faced in the near future if the M-sand is used in the place of river sand during wall plastering? (As per IS)
what is the water cement ratio? how to calculate it? list the wt. of constructions materials including concrete both ordinary and light wt. concrete
What is a projection line?
Which is the best book for building construction?
Would you cause a 55-gallon drum of water to weigh more by climbing in?
Where will be the maximum bending moment in a TEE Beam?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
What is .Dwg?
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
how to calculate number of bitumen for road asphalt
What is zoning permit?
In foundation design, while we do the base pressure check, we normally check if the attained pressure value is less than the GROSS BEARING CAPACITY of the soil which is the sum of net bearing capacity of soil and the overburden pressure. Actually, the overburden pressure acts against the net bearing capacity of the soil and I feel that we are actually increasing the bearing capacity value and doing the check. I feel that this is NOT right. Please clarify on this.