what is the allowable silt content in concrete?..

Answer / sjtbehera

as per Is 383 it is 3%

Is This Answer Correct ?    8 Yes 4 No

what is the allowable silt content in concrete?..

Answer / amitabh joshi

4%

Is This Answer Correct ?    3 Yes 0 No

what is the allowable silt content in concrete?..

Answer / sachin

5%

Is This Answer Correct ?    7 Yes 7 No

what is the allowable silt content in concrete?..

Answer / imran

Varies for type and use of concrete, CPWD and IS both are having conflict in it, generally we take and/or accept 8% silt by Volume after 3 hours, and 3% by dry sieving (Passing from 75 micron IS sieve). for Infra projects it is restricted for 5%.

Is This Answer Correct ?    0 Yes 0 No

what is the allowable silt content in concrete?..

Answer / sahil

According IS-383. Silt content by volume is 8% and by weight 15%

Is This Answer Correct ?    0 Yes 0 No

what is the allowable silt content in concrete?..

Answer / devender singh

8 %.

Is This Answer Correct ?    0 Yes 2 No

what is the allowable silt content in concrete?..

Answer / sis

8%

Is This Answer Correct ?    0 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?

0 Answers   RealPage,


Why chairs are provided at slab?

3 Answers   DLF, Kalpakkam, SKYi,


what is the salry which I am expect in kolkata for diploma in civil engineer with 3 years 6 month exp.???

6 Answers  


How to determine spacing of bars in slabs or beams

0 Answers  


All aptitude question of Bechtel

0 Answers   Bechtel,






can any one explain bar bending schedule of bems and columns and slabs ??

0 Answers  


200mm*200mm thick block work 1sqm how many cement bags

3 Answers   Private,


Use of coping on terrace wall and in 4" wall is compulsory or not ?

0 Answers  


Tell the least count of a prismatic compass , surveyor compass , Theodolite & how we can determine it ?

2 Answers   UPPSC Uttar Pradesh Public Service Commission,


How did the romans get water up hills using aqua ducts?

0 Answers  


If we use oil,inner on the column box, it'll make rust on the column steel?

4 Answers  


Explain what are the phases inspections are done by local authority while construction?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)