What is the yield of 100 litres of water and 10 kg of cement in grout mix?
No Answer is Posted For this Question
Be the First to Post Answer
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
In Rcc ratio calculation I wanted to know quantity of Steel also.
i have a bar of 36 dia in column, what is the lap length?
how many no of cement bags required for 1:4 plastering for 100 sqft? how many no of cement bags required for 1:3 plastering for ceiling for 100 sqft?
discuss the precautions to be taken during the various steps of manufacturing of concrete
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
What is Joule Brayton Cycle?
Name four load bearing elements (structural elements) in a framed building
Diagonal check is required for a layout work to confirm ––
How to convert aggregate and sand from kgs to ltrs ?
What is the lap length in your project?
11 Answers L&T, Practical Viva Questions,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)