Answer Posted / imran
Varies for type and use of concrete, CPWD and IS both are having conflict in it, generally we take and/or accept 8% silt by Volume after 3 hours, and 3% by dry sieving (Passing from 75 micron IS sieve). for Infra projects it is restricted for 5%.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is modular brick and it size
can any one explain bar bending schedule of bems and columns and slabs ??
do we decide reinforcement steel , based on bending moment ? give example with continous slab?
it is possiblee to produce concrete with out cracks...
What are the alternate material for steel, Sand and aggregate
plz.show development and anchorage length in simple diagram.
Define What is made from large rocks, which protects the base of cliffs?
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
Why reinforcement done in shorter span in two way slabs
how many kg of 20mm, 10mm, dust available in one ton stone boulder
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
show answer/calculate mix 1:2:4 ratio -cement-sand -metal-water
what is that one cub metre plaster in cemant and fine sand