Answer Posted / imran
Varies for type and use of concrete, CPWD and IS both are having conflict in it, generally we take and/or accept 8% silt by Volume after 3 hours, and 3% by dry sieving (Passing from 75 micron IS sieve). for Infra projects it is restricted for 5%.
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what is flashing?
What are the different theories of failure under static load?
What are the composition of a landfill?
What is the software used in civil engineering?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
What are the alternate material for steel, Sand and aggregate
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
What do you meant by gui?
What applicable rate of wct in bihar
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
How do you calculate reinforcement weight of steel?
How much cement and sand required for 9"brick wall per square metre
What is the thickness of slab for 600 sq each) 2 slab construction. What should be the size of steel rod?