what is the allowable silt content in concrete?

Answer Posted / amitabh joshi

4%

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.

1555


Describe the various methods of concrete curing?

677


how to shuttering is used in slab

1311


how to identify the failure of building by expansive soils

1222


howto calculate the quantities of material used in fly ash brick after finding the volume??

1165






beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

1645


How we calculate the service time of buildings

1420


How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure

1761


How to determine spacing of bars in slabs or beams

1966


what is polity

1645


What is factor not to be taken in consideration in mix design?

3075


What is the difference between one-way slab and two-way slab?

658


from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar

4149


what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.

1885


In block work seawalls what is the purpose of slip joints?

748